ISR-GEM — Evidence Before Opinion

Worked example

Northbridge Athletic FC — a club facing significant gaps

A fictional club with low readiness across every MLC area moves through the full ISR-GEM process and receives a Hold / Remediate recommendation. Every view below is exactly what your Board would see — no sign-in required.

Fictional example. Northbridge Athletic Football Club is an invented club. All names, dates, scores and findings are illustrative and do not represent any real organisation.

Club profile & assessment setup

Club / licence holder
Northbridge Athletic Football Club
Assessment reference
BRD-PAQ-2026-NBA-001
Assessment date
5 October 2026
Decision date
22 October 2026
Prepared by
ISR-GEM Advisory (Lead Reviewer)
Governance lead
Trevor Selby, Club Secretary
Executive sponsor
Karen Voss, Chair of Trustees
Independent reviewer
M. Penhaligon FCA, ISR-GEM Independent Reviewer
Review mode
Independent Advisory Review
Document version
1.0

Executive dashboard

Diagnostic entry decision & readiness scores

Diagnostic entry decision — recommendation

Hold / Remediate

Six gateway blockers are open across IFR licensing registration, MLC 1 financial-plan readiness, MLC 3 fan consultation and MLC 4 annual declaration. The club does not meet the minimum threshold to proceed to the full diagnostic until the 30-day blockers are closed. Two key roles — Supporter Liaison Officer and Head of Compliance — are vacant and must be filled before remediation can begin.

Open gateway blockers

6

of 19 gateway tests

Gateway partials

3

underway with gaps

High-priority open items

8

across all sections

Assessment completion

34%

of questions answered

Section breakdown — all nine ISR-GEM sections

SectionTitleYesPartialNoOpen gatewaysProgressPosition
AIFR licensing baseline4132 / 3
40%
Not ready
BBoard governance & oversight3221 / 2
45%
Not ready
CBoard composition & effectiveness2131 / 2
30%
Not ready
DMLC 1 — Financial plan readiness2132 / 3
25%
Not ready
EMLC 2 — Corporate governance statement3121 / 2
40%
Not ready
FMLC 3 — Fan consultation1122 / 3
20%
Not ready
GMLC 4 — Annual declaration & notifications1043 / 3
15%
Not ready
HEvidence management & assurance1141 / 2
20%
Not ready
IContinuous improvement & culture3210 / 1
50%
Ready with conditions

Diagnostic evidence readiness

MLC 1–4 evidence position

Evidence-level readiness for each minimum licence condition, drawn from the full diagnostic. Critical gates flag controls that must be demonstrable before licensing.

MLC 1 — Financial plan

25%

2 open gate(s) · 0 blocked

Not ready

MLC 2 — Corporate governance

40%

1 open gate(s) · 0 blocked

Not ready

MLC 3 — Fan consultation

20%

2 open gate(s) · 0 blocked

Not ready

MLC 4 — Annual declaration

15%

3 open gate(s) · 0 blocked

Not ready

Findings register

Gateway blockers, material weaknesses & governance gaps

05-01Gateway BlockerD01 High priority

No financial plan covering the MLC 1 submission period exists; the club has a one-year operating budget only, with no three-year forecast or sensitivity analysis.

MLC 1 cannot be submitted; licence condition B exposure is critical and the regulator will require a remediated plan before any provisional licence is considered.

Owner: Director of Finance · Target: 30 Nov 2026 · Status: Not started

05-02Gateway BlockerD07 High priority

Cash-flow projections do not include a downside scenario for relegation or reduced broadcast income, and there is no documented liquidity buffer policy.

Financial sustainability test under MLC 1 will fail; regulator may impose enhanced monitoring conditions or refuse a provisional licence.

Owner: Director of Finance · Target: 30 Nov 2026 · Status: Not started

05-03Gateway BlockerF01 High priority

No structured fan consultation mechanism exists; the club last conducted a supporter survey in 2022 and has no constituted Fan Advisory Board.

MLC 3 fan consultation requirement entirely unmet; reputational risk and likely regulator directive to consult before licensing.

Owner: Supporter Liaison Officer (vacant) · Target: 15 Dec 2026 · Status: Open

05-04Gateway BlockerG08 High priority

Annual declaration for the previous period was submitted late and is missing two required directors' declarations; the owners & directors test has not been completed for the majority shareholder.

MLC 4 non-compliance; statutory notification risk and potential regulator sanction.

Owner: Club Secretary · Target: 10 Nov 2026 · Status: Open

05-05Gateway BlockerG05 High priority

Change-of-control notifications for two ownership transactions in the prior year were not filed within the statutory window.

MLC 4 notification failure; regulator enforcement action possible.

Owner: Club Secretary · Target: 10 Nov 2026 · Status: Not started

05-06Gateway BlockerA01 High priority

The Board has not formally approved the ISR-GEM Licence Readiness Diagnostic.

The diagnostic cannot proceed without a clear Board mandate and formal authority.

Owner: Chief Executive · Target: 24 Oct 2026 · Status: In progress

05-07Material WeaknessB03 High priority

Board minutes do not evidence documented challenge or dissent on financial matters; audit committee has not met in the last 12 months.

Board effectiveness cannot be demonstrated for MLC 2; governance statement will be qualified.

Owner: Chair of Trustees · Target: 15 Dec 2026 · Status: Open

05-08Material WeaknessC05 Medium priority

Three of five board members have served over nine years; no independence assessment or succession plan is documented.

Board independence and refreshment cannot be evidenced; MLC 2 governance weakness.

Owner: Chair of Trustees · Target: 31 Jan 2027 · Status: Open

05-09Material WeaknessH07 High priority

No controlled evidence repository exists; documents are held in personal drives and email inboxes with no retention schedule or version control.

Evidence cannot be reliably retrieved for the full diagnostic; fieldwork will be severely delayed.

Owner: Head of Compliance (vacant) · Target: 30 Nov 2026 · Status: Not started

05-10Governance GapE06 Medium priority

Corporate governance statement has not been drafted; the club has no documented apply-and-explain position against the Club Code principles.

MLC 2 statement entirely missing; board approval cannot be sought.

Owner: Club Secretary · Target: 31 Dec 2026 · Status: Not started

Improvement opportunities

Value-add initiatives scored on value vs effort

IOAreaOpportunityExpected benefitValueEffortScoreOwnerStatus
06-01Financial planningEngage a fractional CFO to build a three-statement model and train the finance team.Unblocks MLC 1 entirely and builds internal capability for ongoing compliance.5/53/51.67Chief ExecutiveAccepted
06-02Fan engagementConstitute a Fan Advisory Board with ratified terms of reference and a published consultation calendar.Meets MLC 3 and rebuilds supporter trust after a difficult season.5/52/52.50Chief ExecutiveAccepted
06-03Board effectivenessCommission an independent board effectiveness review and recruit two independent non-executive directors.Addresses MLC 2 and board refreshment in one programme.4/54/51.00Chair of TrusteesProposed
06-04Evidence managementImplement a cloud evidence repository with named owners, retention rules and expiry alerts.Enables the full diagnostic to proceed without further delay.5/53/51.67Chief ExecutiveProposed

Corrective-action plan

Prioritised 30 / 60 / 90-day actions

30-day horizon

  • 07-01High

    Formal Board approval for the ISR-GEM Licence Readiness Diagnostic recorded in the minutes.

    Chief Executive · due 24 Oct 2026 · In progress

  • 07-02High

    Complete the evidence review supporting the intended annual declaration.

    Club Secretary · due 10 Nov 2026 · Not started

  • 07-03High

    Complete and approve the assessment of resources needed for current and planned activities.

    Club Secretary · due 10 Nov 2026 · Not started

60-day horizon

  • 07-04High

    Board-approved three-year financial plan (P&L, balance sheet, cash flow) covering the MLC 1 submission period.

    Director of Finance · due 30 Nov 2026 · Not started

  • 07-05High

    Cash-flow downside scenario library and independently reviewed stress tests approved by the Board.

    Director of Finance · due 30 Nov 2026 · Not started

  • 07-06High

    Ratified Fan Advisory Board terms of reference and first formal consultation meeting held.

    Supporter Liaison Officer (to recruit) · due 15 Dec 2026 · Open

  • 07-07High

    Cloud evidence repository established with named owners, retention rules, version control and expiry alerts.

    Head of Compliance (to recruit) · due 30 Nov 2026 · Not started

  • 07-08High

    Audit Committee reconstituted and meeting quarterly; board minutes to evidence documented challenge.

    Chair of Trustees · due 15 Dec 2026 · Open

90-day horizon

  • 07-09Medium

    Complete MLC 2 corporate governance statement with apply-and-explain position against all five Club Code principles.

    Club Secretary · due 31 Dec 2026 · Not started

  • 07-10Medium

    Independent board effectiveness review completed and two independent non-executive directors recruited.

    Chair of Trustees · due 31 Jan 2027 · Open

Two-page board briefing note

Print-ready Board report

The document your Board receives — purpose, executive summary, gateway analysis, key findings and the 30/60/90-day plan, with a sign-off block.

ISR-GEM Licence Readiness Pre-Audit

Executive Briefing Note

EBN-BRD-PAQ-001 · Independent Advisory Review · v1.0

RAG: Red
Club / licence holder
Northbridge Athletic Football Club
Assessment reference
BRD-PAQ-2026-NBA-001
Assessment date
5 October 2026
Executive sponsor
Karen Voss, Chair of Trustees
Governance lead
Trevor Selby, Club Secretary
Independent reviewer
M. Penhaligon FCA, ISR-GEM Independent Reviewer
Prepared by
ISR-GEM Advisory (Lead Reviewer)
Decision date
22 October 2026

1. Purpose and decision requested

To seek Board endorsement of the Hold / Remediate recommendation, approval to recruit into the vacant Supporter Liaison Officer and Head of Compliance roles, and authorisation of the prioritised 30/60/90-day improvement plan with external advisory support.

Formal board recommendation

Hold / Remediate — do not proceed to full diagnostic

2. Executive summary and RAG status

The pre-diagnostic identified significant readiness gaps across all nine ISR-GEM sections. Six gateway blockers are open, spanning IFR licensing registration, MLC 1 financial-plan readiness (no three-year plan, no downside scenarios), MLC 3 fan consultation (no mechanism in place) and MLC 4 annual declaration (late submission, missing directors' declarations, unfiled change-of-control notifications). Two critical roles are vacant, and no controlled evidence repository exists. The club is not in a position to proceed to the full diagnostic until the 30-day blockers — registration and declaration resubmission — are closed.

Assessment completion34% (of questions answered)
Gateway tests21 total · 6 blocked · 3 partial
High-priority open items8
Open material findings10
Corrective actions open10 (closure rate 0%)

3. Gateway blocker analysis and critical exposures

Six gateway blockers prevent any recommendation to proceed. The most urgent are A01 (Board approval), G05 (resource assessment) and G08 (annual declaration evidence), all targetable inside 30 days. D01 and D07 (financial plan and independently reviewed stress tests) require external finance support and a 60-day window. F01 (recognised fan representation) cannot start until the Supporter Liaison Officer role is filled.

  • 05-01 · D01 · Gateway Blocker

    No financial plan covering the MLC 1 submission period exists; the club has a one-year operating budget only, with no three-year forecast or sensitivity analysis.

    Exposure: MLC 1 cannot be submitted; licence condition B exposure is critical and the regulator will require a remediated plan before any provisional licence is considered. — Owner: Director of Finance, target 30 Nov 2026.

  • 05-02 · D07 · Gateway Blocker

    Cash-flow projections do not include a downside scenario for relegation or reduced broadcast income, and there is no documented liquidity buffer policy.

    Exposure: Financial sustainability test under MLC 1 will fail; regulator may impose enhanced monitoring conditions or refuse a provisional licence. — Owner: Director of Finance, target 30 Nov 2026.

  • 05-03 · F01 · Gateway Blocker

    No structured fan consultation mechanism exists; the club last conducted a supporter survey in 2022 and has no constituted Fan Advisory Board.

    Exposure: MLC 3 fan consultation requirement entirely unmet; reputational risk and likely regulator directive to consult before licensing. — Owner: Supporter Liaison Officer (vacant), target 15 Dec 2026.

  • 05-04 · G08 · Gateway Blocker

    Annual declaration for the previous period was submitted late and is missing two required directors' declarations; the owners & directors test has not been completed for the majority shareholder.

    Exposure: MLC 4 non-compliance; statutory notification risk and potential regulator sanction. — Owner: Club Secretary, target 10 Nov 2026.

  • 05-05 · G05 · Gateway Blocker

    Change-of-control notifications for two ownership transactions in the prior year were not filed within the statutory window.

    Exposure: MLC 4 notification failure; regulator enforcement action possible. — Owner: Club Secretary, target 10 Nov 2026.

  • 05-06 · A01 · Gateway Blocker

    The Board has not formally approved the ISR-GEM Licence Readiness Diagnostic.

    Exposure: The diagnostic cannot proceed without a clear Board mandate and formal authority. — Owner: Chief Executive, target 24 Oct 2026.

4. Key findings across MLC areas

AreaYesPartialNoOpen gatewaysPosition
Board governance & oversight3221 / 2Not ready
Board composition & effectiveness2131 / 2Not ready
MLC 1 — Financial plan readiness2132 / 3Not ready
MLC 2 — Corporate governance statement3121 / 2Not ready
MLC 3 — Fan consultation1122 / 3Not ready
MLC 4 — Annual declaration & notifications1043 / 3Not ready
Evidence management & assurance1141 / 2Not ready

5. Prioritised 30/60/90-day improvement plan

30-day

  • 07-01 (High): Formal Board approval for the ISR-GEM Licence Readiness Diagnostic recorded in the minutes. — Chief Executive, due 24 Oct 2026, In progress.
  • 07-02 (High): Complete the evidence review supporting the intended annual declaration. — Club Secretary, due 10 Nov 2026, Not started.
  • 07-03 (High): Complete and approve the assessment of resources needed for current and planned activities. — Club Secretary, due 10 Nov 2026, Not started.

60-day

  • 07-04 (High): Board-approved three-year financial plan (P&L, balance sheet, cash flow) covering the MLC 1 submission period. — Director of Finance, due 30 Nov 2026, Not started.
  • 07-05 (High): Cash-flow downside scenario library and independently reviewed stress tests approved by the Board. — Director of Finance, due 30 Nov 2026, Not started.
  • 07-06 (High): Ratified Fan Advisory Board terms of reference and first formal consultation meeting held. — Supporter Liaison Officer (to recruit), due 15 Dec 2026, Open.
  • 07-07 (High): Cloud evidence repository established with named owners, retention rules, version control and expiry alerts. — Head of Compliance (to recruit), due 30 Nov 2026, Not started.
  • 07-08 (High): Audit Committee reconstituted and meeting quarterly; board minutes to evidence documented challenge. — Chair of Trustees, due 15 Dec 2026, Open.

90-day

  • 07-09 (Medium): Complete MLC 2 corporate governance statement with apply-and-explain position against all five Club Code principles. — Club Secretary, due 31 Dec 2026, Not started.
  • 07-10 (Medium): Independent board effectiveness review completed and two independent non-executive directors recruited. — Chair of Trustees, due 31 Jan 2027, Open.

6. Sign-off

Board Chair

—

Signature and date

Executive Sponsor

Karen Voss, Chair of Trustees

Signature and date

Operational readiness aid only. This briefing note does not replace the club's individual licence, current IFR requirements, prescribed templates or portal directions. Controlled document EBN-BRD-PAQ-001 · Reference BRD-PAQ-2026-NBA-001.

Monitoring & closure

Baseline vs current — action verification

Baseline gateway blockers

6

As at 5 Oct 2026

Current gateway blockers

6

0 closed since baseline

Action closure rate

0%

10 actions still open

Closure verification review

ReviewActionEvidence reviewedCompletion verifiedEffectiveness confirmedResidual riskReviewerDate
09-0107-01IFR portal registration confirmation email and screenshot of submitted category selection.HighIndependent Reviewer2 Oct 2026

The journey Northbridge Athletic followed

From first screening to a remediation roadmap

1

Licence Readiness Pre-Audit

Guided governance review and gateway tests establish scope, ownership and immediate blockers.

2

Licence Readiness Diagnostic

Deferred until 30-day blockers close; evidence-based assessment of governance controls across MLC 1–4.

3

Board Report & Improvement Plan

Prioritised findings, accountable owners, target actions and verification requirements.

4

Implementation & Annual Assurance

Ongoing support and annual assurance once the core diagnostic has established demand.

See this with your club's data

Book a confidential walkthrough and we will take your Board through the live diagnostic on your club — or start the Pre-Audit today.